Official TVS Thread!!!
#9583
Senior Member
iTrader: (1)
Haha oh man up Nancy. What pulley size do you plan on running with that? Right now I've just got 80#'s in with nothing more on the 2.9 and I'm pretty much maxed out. That's the fuel setup I'm considering. I'd be interested to see where your IDC's are to get a good idea if I should go bigger or not.
#9586
well it's a 2.2 build, so its nothing special in terms of the rotating assembly. I just mean in comparison to an lsj.. its just a stroked lsj, and the factory cr is 10:1. technically the lsj is a destroked l61, but whatever haha.
I think my general list is somewhere on the last page or 2.
![](https://scontent-iad.xx.fbcdn.net/hphotos-xfp1/v/t1.0-9/10985666_10204062254137629_7846944444488580475_n.jpg?oh=2c777064efa86d187bcc185525ed1d81&oe=5556A4DE)
![](https://fbcdn-sphotos-c-a.akamaihd.net/hphotos-ak-xfp1/v/t1.0-9/10990814_10204061799846272_9163198135284080720_n.jpg?oh=073b41ab4d1c1949f8ff34b44cc4f0c3&oe=5582A2E1&__gda__=1435241092_bc1bf6f66b4d6f8d7e86786464c9ac08)
Plus a bunch of random stuff like a full 6 rib swap, and misc hoses and ic pump, etc in the garage
I think my general list is somewhere on the last page or 2.
![](https://scontent-iad.xx.fbcdn.net/hphotos-xfp1/v/t1.0-9/10985666_10204062254137629_7846944444488580475_n.jpg?oh=2c777064efa86d187bcc185525ed1d81&oe=5556A4DE)
![](https://fbcdn-sphotos-c-a.akamaihd.net/hphotos-ak-xfp1/v/t1.0-9/10990814_10204061799846272_9163198135284080720_n.jpg?oh=073b41ab4d1c1949f8ff34b44cc4f0c3&oe=5582A2E1&__gda__=1435241092_bc1bf6f66b4d6f8d7e86786464c9ac08)
Plus a bunch of random stuff like a full 6 rib swap, and misc hoses and ic pump, etc in the garage
#9590
Build list is as follows:
-full 6 rib swap
-tvs
-option b/dual pass
-zzp stealth h/e
-zzp radiator
-lsjion ported head
-zzp s2 blower cams
-Perf Autowerks valvesprings
-stock gen 2 block (07 was gen2)
-ARP headstuds
-wiseco pistons 10:1 cr
-eagle rods
-ATI od
-zzp nbs
-GM main and rod bearings
-zzp phenolic spacer
-ls4 tb
-spec flywheel and stage 3+ clutch
-ID1000's
-lsj fuel rail
-ottp return fuel
-aem 320 e85 pump
-a/c delete
The only thing I dont have is the flywheel/clutch, and the return fuel kit is ordered
they said a couple weeks for the machining, and a couple more for assembly. The dude said they are mostly backed up with assembly work at the moment. I told him as long as it was under 2 months, it would be fine, and he laughed. Im anticipating no more than 4-6 weeks, but will know more tomorrow
#9591
Senior Member
iTrader: (2)
I went from a 2.9 on 80's, Dw300, stock system to currently on 2.6 with the fuel cell and BRFPS and have to say I love the 2.6 WAY better. I don't wanna pulley back up. I have the strong fuel system to support the small pulley and want to go to a 2.5 soon here with a bigger intake and LS4.
#9594
Former Vendor
iTrader: (4)
Thanks! here is the list again
Build list is as follows:
-full 6 rib swap
-tvs
-option b/dual pass
-zzp stealth h/e
-zzp radiator
-lsjion ported head
-zzp s2 blower cams
-Perf Autowerks valvesprings
-stock gen 2 block (07 was gen2)
-ARP headstuds
-wiseco pistons 10:1 cr
-eagle rods
-ATI od
-zzp nbs
-GM main and rod bearings
-zzp phenolic spacer
-ls4 tb
-spec flywheel and stage 3+ clutch
-ID1000's
-lsj fuel rail
-ottp return fuel
-aem 320 e85 pump
-a/c delete
The only thing I dont have is the flywheel/clutch, and the return fuel kit is ordered
they said a couple weeks for the machining, and a couple more for assembly. The dude said they are mostly backed up with assembly work at the moment. I told him as long as it was under 2 months, it would be fine, and he laughed. Im anticipating no more than 4-6 weeks, but will know more tomorrow
Build list is as follows:
-full 6 rib swap
-tvs
-option b/dual pass
-zzp stealth h/e
-zzp radiator
-lsjion ported head
-zzp s2 blower cams
-Perf Autowerks valvesprings
-stock gen 2 block (07 was gen2)
-ARP headstuds
-wiseco pistons 10:1 cr
-eagle rods
-ATI od
-zzp nbs
-GM main and rod bearings
-zzp phenolic spacer
-ls4 tb
-spec flywheel and stage 3+ clutch
-ID1000's
-lsj fuel rail
-ottp return fuel
-aem 320 e85 pump
-a/c delete
The only thing I dont have is the flywheel/clutch, and the return fuel kit is ordered
they said a couple weeks for the machining, and a couple more for assembly. The dude said they are mostly backed up with assembly work at the moment. I told him as long as it was under 2 months, it would be fine, and he laughed. Im anticipating no more than 4-6 weeks, but will know more tomorrow